PROJECT CV03
Raid transshipment complex with a crane lifting capacity 35 tons and a hold with a capacity of 4600 cubic meters
Purpose - loading, storage and unloading of bulk cargo.
|
Laying of the keel |
Laid down |
Delivery |
Years of construction |
|
|
2 |
2018-2019 |
# |
Name |
Value |
1. |
Main dimension |
Length overall, m |
63.86 |
Hull length, m |
63.65 |
Length of RS rules, m |
61.104 |
Breadth overall (about), m |
24.21 |
Breadth, m |
24.0 |
Depth, m |
7.20 |
L x B x H |
63.86 x 24.21 x 7.20 = 11 132 |
2. |
Draught on DWL (project) (γ = 1.025 t/m³), m |
5.60 |
3. |
Deadweight on DWL draught (γ = 1.025 t/m³), t |
6980 |
4. |
Endurance, days |
20 |
5. |
Cargo hold capacity (about), m³ |
4607 |
6. |
Crane lifting capacity |
35 t (with boom of 12-30 m) 30 t (with boom of 12-36 m) |
7. |
RS class |
KE R3 Crane vessel |
8. |
Power of DG No.1, ekW |
2 x 900 |
9. |
Power of DG No.2, ekW |
1 x 160 |
10. |
Crew and service personal, pers. |
21 |
|